- Home
- Tarion warranty calculator
Tarion warranty calculator
A new home’s warranty only covers what you report on time. Enter your possession date to see every Tarion deadline for your Ontario home, from the first 41 days to year seven, and the best time to book an inspection before each one.
- Free to use
- Your date stays in your browser
- Share the link with your agent or lawyer
Enter your possession date
This is your warranty start date, usually the day you took possession. Your deadlines appear below, with a marker for where you are today.
Best time to book an inspection
Pre-delivery inspection (PDI)
Your builder walks you through the home before you move in and records anything damaged, incomplete or not working on the PDI form. Bring an inspector so the items that matter get written down.
Book this inspection- Possession
- Your closing day
- Book your inspection
- Once the PDI date is set
Initial Form
List warranty items starting the day after possession. The form is submitted automatically on day 41, and your builder then has 120 days to make repairs. Many people still call this the 30-day inspection.
Book this inspection- Opens
- Day 1
- Submitted automatically
- Day 41
- Book your inspection by
- Day 30
Mid-Year Form
For anything new that shows up in your first months, such as cracks, drafts or doors that start to stick. Add items any time; the form is submitted automatically at the end of the window.
- Opens
- Day 42
- Submitted automatically
- Day 183
Year-End Form
Tarion accepts only one Year-End Form, so an inspection around month 11 makes it count. After day 365, a 10-day grace period needs a manual submission and proof you told your builder.
Book this inspection- Opens
- Day 183
- Submitted automatically
- Day 365
- Book your inspection by
- Day 350
- Grace period ends
- Day 375
Second-Year Form
For items under the two-year warranty: water getting in through the foundation or building envelope, exterior cladding, and the electrical, plumbing and heating systems. You can submit more than one.
Book this inspection- Opens
- First anniversary
- Closes
- Second anniversary
- Book your inspection by
- 3 weeks before it closes
Major Structural Defect Form
For defects that cause a load-bearing part of the home to fail, or that seriously affect your use of it as a home. You can submit several forms, and each one becomes its own case with its own timeline.
Book this inspection- Opens
- Second anniversary
- Closes
- Seventh anniversary
- Book your inspection by
- 60 days before it closes
Based on Tarion’s published timelines as of November 2026. These dates are a guide: confirm yours in your Tarion MyHome account or on Tarion’s claim forms and timelines page.
Tarion warranty deadlines at a glance
Six forms, one timeline. Day counts start from your possession date.
Pre-delivery inspection (PDI)
Before possession
Your builder walks you through the home before you move in and records anything damaged, incomplete or not working on the PDI form. Bring an inspector so the items that matter get written down.
Initial Form
Days 1 to 41
List warranty items starting the day after possession. The form is submitted automatically on day 41, and your builder then has 120 days to make repairs. Many people still call this the 30-day inspection.
Mid-Year Form
Days 42 to 183
For anything new that shows up in your first months, such as cracks, drafts or doors that start to stick. Add items any time; the form is submitted automatically at the end of the window.
Year-End Form
Days 183 to 365
Tarion accepts only one Year-End Form, so an inspection around month 11 makes it count. After day 365, a 10-day grace period needs a manual submission and proof you told your builder.
Second-Year Form
Year 2
For items under the two-year warranty: water getting in through the foundation or building envelope, exterior cladding, and the electrical, plumbing and heating systems. You can submit more than one.
Major Structural Defect Form
After year 2, up to year 7
For defects that cause a load-bearing part of the home to fail, or that seriously affect your use of it as a home. You can submit several forms, and each one becomes its own case with its own timeline.
Which inspection fits each deadline
An inspection before a deadline gives you a written report with photos, so your list of warranty items is complete and specific.
Pre-delivery inspection (PDI)
Before you take possession.
See what is includedInitial Form inspection (first 41 days)
Often called the 30-day inspection.
See what is includedYear-end (11-month) Tarion inspection
Before your first year ends.
See what is includedSecond-year Tarion inspection
Your last chance for two-year coverage.
See what is includedMajor structural defect inspection (years 3–7)
Before your seven-year coverage ends.
See what is included
For real estate agents
If you work with buyers of new builds, you are welcome to share this page. Once a buyer enters their date, the address carries it, so you can send them straight back to their own timeline.
Questions about Tarion deadlines
Short answers to what new-home buyers ask most. For anything about your own claim, Tarion has the final word.
What is my Tarion warranty start date?
It is the date your warranty begins, usually the day you took possession of your new home. For a condo, use your interim occupancy date. Your Tarion documents and your MyHome account show the date they have on file.
When is the Tarion Initial Form due?
You can list items starting the day after possession. The Initial Form is submitted automatically on day 41, and your builder then has 120 days to make repairs. Many people still call it the 30-day form. Booking your inspection by day 30 leaves time for the report.
Do I have to send the Tarion forms myself?
The Initial and Year-End forms are submitted automatically on their last day, using the items you have listed by then. After day 365 there is a 10-day grace period for the Year-End Form, but it needs a manual submission and proof that you told your builder.
What is the difference between the Year-End and Second-Year forms?
Tarion accepts only one Year-End Form, so it is worth getting it right with an inspection around month 11. The Second-Year Form covers items under the two-year warranty, such as water getting in through the foundation or building envelope, and the electrical, plumbing and heating systems. You can submit more than one.
What counts as a major structural defect?
A defect that causes a load-bearing part of the home to fail, or that seriously affects your use of it as a home. You can submit several forms from year 3 to year 7, and each one becomes its own case with its own timeline.
Does an inspection replace my Tarion forms?
No. An inspection gives you a written report with photos to help you list items completely. The forms and claims themselves are between you, your builder and Tarion.
Is this calculator official?
No. I am an independent home inspector, not Tarion. The dates follow Tarion’s published timelines as I last checked them in November 2026. How days are counted can shift a date by a day, so confirm yours in your Tarion MyHome account or on tarion.com.
Can I share my dates with someone?
Yes. After you enter your date, use “Copy link to these dates”. The link carries only your possession date, so whoever opens it sees the same timeline. You can also add the upcoming dates to your calendar or print the page.